Versions of s. 127.48(9)(d)
-
in respect of each clean hydrogen project, the taxpayer shall file final detailed engineering designs with the Minister of Natural Resources by the earlier of the day on which hydrogen is first produced by the project and the day that is 60 days after the final detailed engineering designs are prepared; and