Versions of s. 45(1)
-
When a deviation, change or alteration is required by a company to be made in its pipeline, or any portion of that pipeline, as already constructed or as merely located and approved, a plan, profile and book of reference of the portion of the pipeline proposed to be changed, showing the deviation, change or alteration proposed to be made, shall be submitted for the approval of the Board.