N-7 — National Energy Board Act · 2 versions

Historical text comes from the Justice Laws point-in-time corpus and is unofficial — not the official version.

  1. 2016-06-19 to present available View Source
    If a deviation, change or alteration is required to be made to a portion of an international power line by the holder of a permit or certificate issued in respect of the power line and the deviation, change or alteration passes in, on, over, under, through or across a navigable water, section 45 also applies to that portion of the power line as if each reference in that section to
    Full text

    If a deviation, change or alteration is required to be made to a portion of an international power line by the holder of a permit or certificate issued in respect of the power line and the deviation, change or alteration passes in, on, over, under, through or across a navigable water, section 45 also applies to that portion of the power line as if each reference in that section to

  2. 2013-07-03 to present View Source

    If a deviation, change or alteration is required to be made to a portion of an international power line by the holder of a permit or certificate issued in respect of the power line and the deviation, change or alteration passes in, on, over, under, through or across a navigable water, section 45 also applies to that portion of the power line as if each reference in that section to