Versions of s. 27(5.2)
-
Each drawing is to include references corresponding with the specification. The Commissioner may, as the Commissioner sees fit, require further drawings or dispense with the requirement to furnish any drawing.
Each drawing is to include references corresponding with the specification. The Commissioner may, as the Commissioner sees fit, require further drawings or dispense with the requirement to furnish any drawing.