Majority
Headnote
[1] Street Law—Departures from Procedure—Invalidity of Assessment.—In proceedings in invUwn small departures from the lawful procedure are fatal to a street assessment, in the absence of curative provisions.Defendants appeal from judgments rendered against them foreclosing the lien of street assessments for the improvement of Nineteenth Avenue, in San Francisco, with all street crossings but one, between Quintara and Vicente Streets, by paving, curbing, and sewering; the latter for one block only. The appeals from the two judgments are to be considered together, and only differ for the reason that they are for assessments upon different properties and against different persons. The same points are raised as in Federal Construction Co. v. Wolfson, ante, p. 267, [ 199 Pac. 512 ], and have been determined therein against appellants’ contention. In addition to the points there raised it is claimed that the assessment is void for failure to comply with certain provisions of the Street Improvement Ordinance of San Francisco with relation to the manner of making and levying of assessments. In making the assessment the five separate blocks in which the work was done were separately assessed. In four of the blocks the cost of curbing and paying was added and a single front-foot rate of $5.881867 was ascertained as the rate to cover this cost and the proper proportion of incidental expenses. In the other block only, between Vicente and Ulloa Streets, a sewer was laid, and in this block separate assessments were levied for each item, curbing, paving, and sewer, with a front-foot rate of $.770087 for curbing, $5.125058 for paving and $1.026121 for sewer. Thus the cost per front ioot for curbing and paving in this block was $5.895145. Hence the rate for pavement and curbing is greater by $.013278 in this block. This increased rate is due to two factors: First, a charge of fifteen dollars is made for inspection of curbing in this block and ninety dollars is made for the inspection of pavements, whereas in all the other blocks the charge for inspection of both paving and curbing is ninety dollars. This item of fifteen dollars accounts for $.01304 of the difference, and the balance, $.000238 per front foot, is due to the fact that the one-fifth of the whole amount of the incidental expenses for printing and engineering was apportioned to a frontage of 1,150 instead of one thousand two hundred feet, as in the other blocks. If the rate of assessment had been the same in each block, the mere fact of separate estimates in each block would be of no importance. [1] The difference in the rate of assessment for curbing and paving in the
The lot of the defendant Newhouse has a frontage along Nineteenth Avenue greater than one-half a block. Only that part of his lot within the quarter block is liable for assessment for the improvement of the adjacent street crossing. There is a failure in the diagram and assessment to indicate the portion of the lot liable for the street crossing assessment, although that assessment is correctly computed upon the frontage of the lot within the quarter block and liable for the assessment. The error is in extending the lien thereof over the whole of the lot. To state the objection in the language of the respondent, the appellant relies upon “the failure to draw the usual red line” indicating the limit of the quarter block. The error complained of has been held fatal to an assessment under the Vrooman Act [Stats. 1885, p. 147], (Parker v. Reay, 76 Cal. 103 , 104, 105, [ 18 Pac. 124 ]; Dyer v. Harrison, 63 Cal. 447 , 450.) This error, however, only applies to the crossing assessment amounting to $161.88. 'These trivial errors could have been readily remedied if the attention of the city officials had been called thereto by an appeal, but it has been uniformly held under the provisions of the Vrooman Act (see, 11) that the owner
[2] Before discussing the effect of these errors, under the San Francisco Street Improvement Ordinance, one other alleged error appearing upon the face of the assessment may be disposed of, namely, the assessment of the cost of the sewer only along the property fronting on the same. This was the proper method of assessment as the sewer improvement was virtually a separate and independent improvement, no doubt incorporated in the plan of improvement solely because it was desirable to have the sewers laid before the street was paved. [3] The defendants, in any event, cannot complain of the invalidity of the separate and distinct sewer assessment. If invalid, that part alone was invalid. (Perine v. Lewis, 128 Cal. 236 , 241, [ 60 Pac. 422 , 772], opinion denying rehearing, p. 241.) The defendants’ property is not located in the block in which the cost of the sewer was assessed, and in which the excessive amount of incidental expenses was apportioned, and they cannot complain thereof. (See Dyer v. Parrott, 60 Cal. 551 .)
Defendants were, however, injuriously affected by the failure to include one fifty-foot lot in the assessment for curbing, and in the case of a frontage assessment under the Vrooman Act where such error appears on the face of the record, the whole assessment is void. (See authorities cited in Larsen v. San Francisco, 182 Cal. 1 , [ 186 Pac. 757 , 763].) Two errors, then, appear upon the face of the assessment,— one affecting the assessment for curbing, and the other the assessment for the work done in the street crossing. It has been uniformly held, under the Vrooman Act and its various amendments, that where an assessment is void upon its face, even though it could be readily corrected on appeal, a property holder is not aggrieved by such void assessment, and that the contractor, being the party aggrieved, should appeal, and, failing thus to have the assessment corrected, is unable to enforce the invalid assessment. (Ryan v. Altschul, 103 Cal. 174 , [ 37 Pac. 339 ]; City Securities Co. v. Harvey, 176 Cal. 682 , [ 169 Pac. 380 ].)
[4] If these decisions under the Vrooman Act apply in this case we must hold invalid the crossing assessment and
All other defects in the assessment and diagram relied on by the appellants to show its invalidity, such as the use of the customary sign to indicate feet (') and inches (") are sufficiently met by stating that the exclusive remedy therefor was likewise by appeal.
[5] There remains but one other question, and that is whether or not the failure to complete the work within the time limited in the contract is fatal to the assessment. Under the Yrooman Act it has been held that such failure invalidates the assessment. (Kelso v. Cole, 121 Cal. 121 , [ 53 Pac. 353 ].) It also has been uniformly held under the Yrooman Act that the remedy for a failure to fully perform the contract where the work has been accepted and an assessment issued therefor is by an appeal to the city council or other legislative body, according to section 11. (McLaughlin v. Knobloch, 161 Cal. 676 , [ 120 Pac. 27 ]; Creed v. McCombs, 146 Cal. 449 , [ 80 Pac. 679 ]; Lambert v. Bates, 137 Cal. 676 , [ 70 Pac. 777 ]; Petaluma Paving Co. v. Singley, 136 Cal. 616 , [ 69 Pac. 426 ]; Hadley v. Dague, 130 Cal. 207 , [ 62 Pac. 500 ]; Girvin v. Simon, 116 Cal. 604 , [ 48 Pac. 720 ]; McIntyre v. Los Angeles, 23 Cal. App. 681 , [ 139 Pac. 240 ], rehearing denied.) The court in this case found that the work was completed in time, and"appellants attack this finding as unsupported by the evidence. The utmost claimed by the defendants is that some minor portions of the work were incomplete at the time the first extension ■ of the contract expired, and that there was a hiatus between the first and second extension. The plaintiff, however, claims that the
In view of this conclusion of the trial court as to the fact of completion, which is sustained by the evidence, we are not required to consider whether evidence of noncompletion is admissible under the authority last hereinabove cited (McLaughlin v. Knobloch, and other eases, supra), nor whether the curative clause of section 21 validates the assessment under the decision in Oakland Paving Co. v. Whittell Realty Co., 185 Cal. 113 , [ 195 Pac. 1058 ]. In this connection it should be observed that while the curative clause of the statute therein considered (Stats. 1911, p. 730, sec. 26) is the same as in the Street Improvement Ordinance of San Francisco, section 14 of the ordinance expressly provides that “In case of failure on the part of the contractor ... to complete . . . his contract within the time fixed in the contract, or within such extension of said time . . . his . . . contract shall be void, and no assessment shall be made for the work done under said contract.” Whether in the light of this legislative declaration a failure to complete the work within the time indicated could be declared an error, irregularity, or informality, is a question we need not determine, but one which may well command the attention of the board of supervisors of the city and county of San Francisco.
The judgments are affirmed.
•Olney, J., Shaw, J., Sloane, J., Angellotti, C. J., Lennon, J., and Lawlor, J., concurred.
Rehearing denied.
All the Justices concurred, except Wilbur, J., who was ah-sent.
Cases cited
- Chapman v. Jocelyn 182 Cal. 294 p. 287
- Parker v. Reay 76 Cal. 103 at 104, 105 p. 287
- Dyer v. Harrison 63 Cal. 447 at 450 p. 287
- Ryan v. Altschul 103 Cal. 174 p. 288
- Perine v. Lewis 128 Cal. 236 at 241 p. 288
- Dyer v. Parrott 60 Cal. 551 p. 288
- Larsen v. City & County of San Francisco 182 Cal. 1 p. 288
- City Securities Co. v. Harvey 176 Cal. 682 p. 288
- Oakland Paving Co. v. Whittell Realty Co. 185 Cal. 113 p. 289, p. 291
- Kelso v. Cole 121 Cal. 121 p. 290
- McLaughlin v. Knobloch 161 Cal. 676 p. 290
- Creed v. McCombs 146 Cal. 449 p. 290
- Lambert v. Bates 137 Cal. 676 p. 290
- Petaluma Paving Co. v. Singley 136 Cal. 616 p. 290
- Gardner v. Stare 69 Pac. 426 p. 290
- Hadley v. Dague 130 Cal. 207 p. 290
- Girvin v. Simon 116 Cal. 604 p. 290
- McIntyre v. City of Los Angeles 23 Cal. App. 681 p. 290