In these actions plaintiffs sought damages for personal injuries alleged to have been caused by the negligence of Riverside Portland Cement Company, hereafter referred to as defendant, and California Electric Power Company, hereafter referred to as California. The jury awarded $50,000 to plaintiff Austin (reduced to $25,000 on motion for new trial) and $100,000 to plaintiff Boehm against defendant. Its verdict was for California and against plaintiffs. The injuries were caused by electricity burns when a crane came in contact with an overhead conduit of electricity.
Defendant appeals from the judgments entered on the verdicts. It asserts that the evidence was insufficient to establish any negligence on its part; that any claimed negligence on its part was not the proximate cause of the injuries; that plaintiffs were contributively negligent as a matter of law; and error was committed in the giving of instructions to the jury.
Defendant owns and operates a plant for the manufacture of cement on a plot of about 6 acres of ground. A contract was made between it and Haddock Company to perform, as independent contractor, extensive alteration and construction work on the plant and premises and Haddock was engaged in doing repair work for defendant on one of defendant’s rock crushers at the time of the accident on January 10, 1947. Plaintiffs were Haddock’s employees. The job was a “rush” job and it was known by defendant that the work would require night as well as day work. At all times defendant continued the operation of its plant night and day. It retained control of its premises and plant, although not of Haddock’s employees, equipment and operations, and had a man on the job (Mr. Brophy, at the time here pertinent) whose duties were to observe Haddock’s work and to represent defendant in connection therewith. Haddock was to interfere as little as possible in its work with the operation by defendant of its plant. Defendant through its supervisory employees knew that Haddock frequently used cranes with 60-foot booms[1] in its work; that the cranes worked in various
* A crane as referred to consists of a mobile truck or tractor on which is mounted a boom and the machinery necessary to raise and *230 lower it and its cables. The operator of the boom performed his work in a cab on the truck or tractor and the driver of the truck or tractor performed his function from a cab on the truck or tractor.
On defendant’s premises, as a means of access to the crusher to be repaired, was a ramp or private road. Crossing the road, and about 160 feet from the crusher, California owned and maintained an uninsulated three-wire power line carrying 33,000 volts for use by defendant in its plant. The wires were 43.8 feet above the ground. While, as stated the line was owned by California, defendant could request and the request would be granted, to have the power shut off—the line deenergized. In fact the request had been granted on previous occasions. Haddock had no authority to have the lines deenergized. Such deenergization would stop the operation of defendant’s plant but would cause no damage thereto other than the loss of production during the shutdown and the deenergization and reenergization is a simple process of opening and closing a switch. The crusher repair job would take several hours. There also was no obstacle to the posting of warnings by defendant. (The poles supporting the wires had notices of high voltage presumably placed there by California.) In addition to the general knowledge of defendant of the danger of cranes operating near power lines, it had specific knowledge that the deenergization of those lines, when cranes were being operated near the power lines, was a proper safety precaution. Prior to the repair job on the crusher in December, and in connection therewith, Haddock’s superintendent Martin requested defendant’s superintendent Brophy that the power be shut off so it would be safe to move a crane about and Brophy refused because it would require the shutdown of defendant’s plant. (There is considerable conflict on this issue but the testimony is reasonably susceptible of the foregoing.) It could be inferred that defendant knew the same deenergization would be needed for the safety of Haddock’s men during the January 10th repair of the crusher but should not expect Haddock to make the request in view of the recent refusal.
The rock crusher consisted of a structure in which rock was deposited. It was crushed by a mauler attached to the end of a 20-foot steel shaft. The repair required that the shaft and mauler be removed from the structure in order that the joinder of the mauler and the shaft could be made secure by removing the zinc holding the two together and placing new zinc in its place.
Late in the afternoon of January 10th, Haddock’s employees were directed to assist in the repair of the crusher and the work thereon proceeded between 5:30 and 6 o ’clock. A crane together with a boom cable operator and truck operator were present to lift the shaft and mauler. Plaintiffs testified that it was dark and the power line was not visible; there was barely enough light to work on the crane. To fit the crane for the job required a rigging of three cables on the boom on the lifting end of which was the lifting hook. Plaintiffs were assisting in rigging. The boom was parallel to the ground, the end being five or six feet above the ground. The three cable rigging had been done and plaintiffs went to the crane truck to get the headache ball, a weight to be attached near the lifting hook to keep the cables taut and in proper place. On returning to the end of the cable and hook to attach the ball, the boom had been raised to about 45 degrees and evidently the truck had been moved toward the power line to shorten the distance the ball would have to be carried. The hook was several feet above the ground. Plaintiffs were carrying the ball together and Austin grasped the hook to attach the ball. The hook was charged with electricity because of the proximity of the boom to the power line. When Austin grasped the hook, the electricity flowed through him, the ball and Boehm resulting in the injuries for which damages were awarded.
This court recently stated the rule with reference to the duty owed by one who has control of electricity. “ £On the subject of negligence the standard of care is, that one maintaining wires carrying electricity is required to exercise the care that a person of ordinary prudence would exercise under the circumstances. Among the circumstances are the well known dangerous character of electricity and the inherent risk of injury to persons or property if it escapes. Hence, the care used must be commensurate with and pro
Under the facts in the instant case, the jury was justified in finding, as it impliedly did, that defendant was negligent and its negligence was the proximate cause of plaintiffs’ injuries. The jury could conclude that, knowing as defendant did, that Haddock’s cranes operated in the vicinity of the power line, unless the power was cut off a danger existed; that work called for night operation and the lighting was such that the wires were not visible; that it should have anticipated that the boom of the crane might come in contact with the wires permitting the electricity to be conducted to a place where it would cause injury; that there was not adequate basis for believing that Haddock’s employees would discover the condition or realize the danger involved because the wires were not visible and the employees might justifiably assume that they were not charged or they might momentarily have forgotten their presence due to the rush job and nature of the work.
Defendant refers to the testimony of Martin, Haddock’s superintendent, that he knew of the presence of the wires when the work on the crusher was being done and that of plaintiffs that they knew of the wires. Martin’s testimony was contradictory and could have been disbelieved by the jury. The jury could have concluded that while plaintiffs knew generally of the presence of the wires, the nature of the job and visibility conditions were such that the danger was not so obvious to plaintiffs that defendant would be relieved of liability.
Stress is also laid upon the duty under the statutes and regulations and that it was Haddock’s nondelegable duty
The foregoing discussion is also pertinent to the question of contributory negligence. On the basis of the above discussed evidence the jury was justified in finding that plaintiffs were free from contributory negligence. While plaintiffs may have observed the wires on defendant’s premises they may, as persons of ordinary prudence, have momentarily forgotten their presence under the circumstances. Momentary forgetfulness may be in accord with the conduct of a reasonably prudent man. (See Bickham v. Southern Calif. Edison Co., 120 Cal.App.2d 815 [ 263 P.2d 32 ]; Bartuluci v. San Joaquin L. & P. Corp., 21 Cal.App.2d 376 [ 69 P.2d 440 ]; Nevis v. Pacific Gas & Elec. Co., 43 Cal.2d 626 [ 275 P.2d 761 ]; and cases cited infra.)
Moreover, it should be emphasized that the questions of negligence, proximate cause and contributory negligence under circumstances such as we have here are to he determined by the trier of fact. (Nevis v. Pacific Gas & Elec. Co., supra, 43 Cal.2d 626 .)
The court, however, on its initiative gave an instruction that it was not instructing on “the doctrine of assumption of risk because that doctrine is not applicable in this case. However, the court is instructing you on the doctrine of contributory negligence” and the instructions on that issue will govern your deliberations on the issue of contributory negligence. The evidence would have justified an instruction on assumption of risk; however, we believe that, while assumption of risk and contributory negligence are distinguishable
Defendant contends error in the following instruction requested by plaintiffs but modified by the court: “If you should find that. plaintiff knew that high voltage lines were present, . . . and constituted a hazard, such fact does not necessarily establish that plaintiff was contributively negligent. Mere forgetfulness of a known danger will not bar recovery unless such forgetfulness constitutes negligence
Defendant’s main contention is that the instruction is not a correct statement of the law in that momentary forgetfulness cannot indicate lack of contributory negligence unless plaintiff is acting after being confronted with a sudden and disturbing situation which causes the forgetfulness. It should be remembered the work in which plaintiffs were engaged required them to be in the vicinity of the wires and the job was a “rush” one being done in the dark. The rule with respect to the bearing of forgetfulness on contributory negligence- has been stated in many cases. As expressed in many cases, and recent ones, whether forgetfulness of a known danger constitutes contributory negligence is a question for the trier of fact, giving consideration to the circumstances even though there is no sudden disturbance or peril confronting the plaintiff and causing the lapse of memory; to forget is not negligence unless it shows a want of ordinary care. Generally the question is one for the jury. (Hayes v. Richfield Oil Corp., supra, 38 Cal.2d 375 , 385; Kirk v. Los Angeles Ry. Corp., 26 Cal.2d 833 , 840 [ 161 P.2d 673 , 164 A.L.R. 1 ]; Neel v. Mannings, Inc., 19 Cal.2d 647 , 656 [ 122 P.2d 576 ]; Gibson v. County of Mendocino, 16 Cal.2d 80 , 89 [ 105 P.2d 105 ]; Hall v. Barber Door Co., 218 Cal. 412 , 420 [ 23 P.2d 279 ]; Meindersee v. Meyers, 188 Cal. 498 , 503-504 [ 205 P. 1078 ]; Giraudi v. Electric Imp. Co., 107 Cal. 120 , 125 [ 40 P. 108 , 48 Am.St.Rep. 114 , 28 L.R.A. 596 ]; Smith v. Southern Pac. Co., 201 Cal. 57 [ 255 P. 500 ]; Roseberry v. Edward F. Niehaus & Co., 166 Cal. 481 , 483 [ 137 P. 232 ]; Jacobson v. Oakland Meat etc. Co., 161 Cal. 425 , 430 [ 119 P. 653 , Ann.Cas. 1913B 1194]; Harris v. Joffe, 28 Cal.2d 418 , 425 [ 170 P.2d 454 ]; see cases collected 19 Cal.Jur. 587-593,
The following jury instructions are challenged. Instruction No. 64: “It was the duty of the defendant cement
The judgments are affirmed.
Gibson, C. J., Shenk, J., Traynor, J., Schauer, J., and Spence, J., concurred.
Appellant’s petition for a rehearing was denied May 4,1955.
Cases cited
- Dow v. Sunset Telephone & Telegraph Co. 157 Cal. 182 at 186 p. 232
- Dunn v. Pacific Gas & Electric Co. 43 Cal.2d 265 at 273 p. 232
- Delk v. Mobilhomes, Inc. 118 Cal.App.2d 529 p. 232
- Lamar v. John & Wade, Inc. 70 Cal.App.2d 806 p. 232
- Bazzoli v. Nance's Sanitarium, Inc. 109 Cal.App.2d 232 p. 232
- Dingman v. A. F. Mattock Co. 15 Cal.2d 622 p. 232
- La Malfa v. Piombo Bros. 70 Cal.App.2d 840 p. 232
- Sexton v. Brooks 39 Cal.2d 153 at 156 p. 233
- Crane v. Smith 23 Cal.2d 288 at 296 p. 233
- Hard v. Hollywood Turf Club 112 Cal.App.2d 263 p. 234, p. 240
- Westover v. City of Los Angeles 20 Cal.2d 635 p. 234
- McEvoy v. American Pool Corp. 32 Cal.2d 295 p. 234
- Stasulat v. Pacific Gas & Electric Co. 8 Cal.2d 631 p. 234
- Mosley v. Arden Farms Co. 26 Cal.2d 213 at 219 p. 234
- Hayden v. Paramount Productions, Inc. 33 Cal.App.2d 287 p. 234
- Bickham v. Southern California Edison Co. 120 Cal.App.2d 815 p. 234
- Bartuluci v. San Joaquin Light & Power Corp. 21 Cal.App.2d 376 p. 234
- Nevis v. Pacific Gas & Electric Co. 43 Cal.2d 626 p. 234
- Prescott v. Ralphs Grocery Co. 42 Cal.2d 158 at 161-162 p. 235, p. 236
- Hayes v. Richfield Oil Corp. 38 Cal.2d 375 at 385 p. 235, p. 236, p. 237
- Tossman v. Newman 37 Cal.2d 522 p. 235
- Kirk v. Los Angeles Railway Corp. 26 Cal.2d 833 at 840 p. 237
- Neel v. Mannings 19 Cal.2d 647 at 656 p. 237
- Gibson v. County of Mendocino 16 Cal.2d 80 at 89 p. 237
- Hall v. Barber Door Co. 218 Cal. 412 at 420 p. 237
- Meindersee v. Meyers 188 Cal. 498 at 503-504 p. 237
- Giraude v. Elec. Improvement Co. of San Jose 107 Cal. 120 at 125 p. 237
- Smith v. Southern Pacific Co. 201 Cal. 57 p. 237
- Roseberry v. Edward F. Niehaus & Co. 166 Cal. 481 at 483 p. 237
- Jacobson v. Oakland Meat & Packing Co. 161 Cal. 425 at 430 p. 237, p. 238
- Harris v. Joffe 28 Cal.2d 418 at 425 p. 237
- Reynolds v. Los Angeles Gas & Electric Co. 162 Cal. 327 p. 238
- Ergo v. Merced Falls Gas & Elec. Co. 161 Cal. 334 p. 238
- Andre v. Allynn 84 Cal.App.2d 347 at 351 p. 238
- Schleif v. Grigsby 88 Cal.App. 174 p. 238
- Jacobs v. Bozzani Motors, Ltd. 109 Cal.App.2d 681 p. 239
- Barboza v. Pacific Portland Cement Co. 162 Cal. 36 at 40 p. 239
- People ex rel. State Department of Public Works v. American Smelting & Refinining Co. 34 Cal.App.2d 457 at 460-461 p. 239
- Mecham v. Crump 137 Cal.App. 200 at 203-204 p. 239
- People v. Wisdom 133 Cal.App. 694 at 696-697 p. 239
- Jones v. Hedges 123 Cal.App. 742 at 752 p. 239
- Driscoll v. California Street Cable Railroad 80 Cal.App. 208 at 215 p. 239
- Ostertag v. Bethlehem Shipbuilding Corp. 65 Cal.App.2d 795 at 801 p. 239
- Shanley v. Am. Olive Co. 185 Cal. 552 p. 240
- Mautino v. Sutter Hospital Ass'n 211 Cal. 556 p. 240
- Neuber v. Royal Realty Co. 86 Cal.App.2d 596 p. 240