Majority
Plaintiff appeals from an adverse judgment in its suit to foreclose a claimed lien for materials furnished to certain houses constructed for defendant on the latter’s land. For reasons which will appear we have concluded that the trial court erred in its determination that plaintiff had been paid in full for such materials, and that the judgment should be reversed.
Defendant Rollingwood Homes Company, hereinafter called Rollingwood, owner and developer of 127 lots of land (known as tract 21269) in Los Angeles County, contracted with Walter R. Sant and Sons (hereinafter sometimes called Sant or general contractor) as general contractor to construct 127 houses on such lots. To finance the construction costs defendant secured a loan from Pioneer Savings and Loan Association (hereinafter called Pioneer), under arrangements whereby Pioneer disbursed the construction funds on successive “orders” which were to be prepared by the general contractor and which would direct Pioneer to disburse varying amounts.
The general contractor and Frank Horpel, as subcontractor, entered into a subcontract whereby Horpel agreed to furnish and install wallboard in the houses. The subcontract provided that 50 per cent of the wallboard contract price for each house was payable to Horpel on completion of hanging the wallboard in the subject house and the remaining 50 per cent was payable upon completion of the wallboard installation in that house.
Between January 2, 1957, and July 1, 1957, plaintiff de
On the back of the form is a blank release of lien rights for material and labor furnished to the lots designated on the front of the form. After the appropriate data had been placed in the blanks of the form, Horpel obtained signatures to the proposed order and proposed release of lien rights, including the signature of plaintiff materialman. The order portion of the form was signed on a line described as “Signature of Owner,” as follows: “Rollingwood Homes Co. George R. Sant.” Sant was a partner in the firm which was general contractor; he was also a representative of defendant owner, Rollingwood. The signed order and release were then submitted to Pioneer, which would thereupon issue a check in the amount of the order, payable to plaintiff and Horpel jointly.
The above procedure was followed consistently from lot one through the first billing on lots 116 through 120.[1] However,
1 The parties to this action stipulated that plaintiff had sold materials to the subcontractor, Horpel, for use on other tracts of land “upon which these same defendants were involved,” and the same “pattern *792 of dealings ’ ’ liad been followed, consisting of two billings for each lot, signed lien releases, payment orders directed to the lending institution, and joint cheeks issued to plaintiff and Horpel. The witness J. S. Sehirm testified, for plaintiff, that this billing and payment procedure had been employed by the parties on two previous tracts of land and had first "started in plaintiff’s dealings with Horpel and Sant (general contractor, and also representative of the owner, Rollingwood) in February or March 1956.
On November 6, 1957, plaintiff filed a materialman's lien claim against lots 116 through 120 in the amount of $164 each, and against lots 121 through 127 in the amount of $328 each—a total of $3,116. Rollingwood recorded a bond pursuant to section 1193.2 of the Code of Civil Procedure, guaranteeing payment of any sum which plaintiff might recover on its lien claim. On January 24, 1958, plaintiff commenced this action to foreclose the lien. Rollingwood answered and cross-complained, alleging in the answer that plaintiff had been fully paid for all materials furnished by it for use on the property, and seeking by the cross-complaint to recover damages allegedly resulting from the filing of the lien.
The trial court found that plaintiff had been fully paid, by means of the cheeks payable to plaintiff and Horpel jointly, for all materials furnished by plaintiff for use on the property. That finding was a product of the court’s conclusion that plaintiff was “required by law to apply the funds derived from said joint checks in payment of all materials furnished by plaintiff . . . before using the funds for any other purpose. ’ ’
With respect to the cross-complaint, the court found that Rollingwood was damaged in the amounts it was required or had agreed to pay; i.e., the bond premium, filing fee, and $1,400 as attorney’s fee. This appeal by plaintiff followed.
In support of the judgment the owner, Rollingwood, relies upon Edwards v. Curry (1957) 152 Cal.App.2d 726 [ 313 P.2d 613 ], and Westwood Bldg. Materials Co. v. Valdez (1958) 158 Cal.App.2d 107 [ 322 P.2d 79 ]. In both of those cases, as here, joint checks were issued to the subcontractor and the materialman. In neither case, however, does it appear to have been shown that the proceeds of the cheeks were intended by the parties to be applied in any specific manner or in pay
By contrast in the case at bench the respective payment orders, with the accompanying releases of lien claims presented to and signed by plaintiff, were, as already described herein, expressly and specifically prepared to cover only the lots designated by number thereon. Mr. J. S. Schirm, testifying as an officer of plaintiff corporation, stated that after plaintiff had signed the release of lien on the back of each payment order and the order had been delivered to Pioneer, “The next step would be that Mr. Horpel would come in after he had received the joint check, and we would negotiate the payments at that time when he came into the office”; that plaintiff retained from each check an amount for each lot covered by the billing for which the check had been issued as shown by the payment order, i.e., one-half of the cost of the
Rollingwood’s argument that because plaintiff was one of the two payees named in the joint cheeks, plaintiff was obliged
2 As already stated, the subcontract provided for payment to Horpel of one-half on the first billing and one-half on the second billing for each of the designated lots.
3 The witness J. S. Schirm further testified on this subject as follows: Plaintiff materialman maintained a “running balance” on its account with Horpel for material furnished to Horpel for use on the tract involved in this litigation, as well as on the two previous Rollingwood tracts on which the same payment procedure had been followed (see fn. 1, ante). Each joint check would be in payment of a billing submitted ‘ ‘ just prior thereto ’ ’ and would cover material delivered ‘ ‘ four to five weeks” theretofore. Plaintiff determined which lots “were paid for ... by the joint cheek that was received . . . , along with the voucher that had gone in, determining what lots were billed and what lots were being paid for by the contractor. ’ ’ On the subject tract, when Horpel would bring in the joint checks (which had vouchers attached), “I put the checks in the bank and gave Mr. Horpel his share . . . [H]is share was a proportion because these vouchers were payment for labor and material. A certain portion was material and a certain portion was labor.” Plaintiff and Horpel “would break the payments down. ... We had agreed to so much a lot for each building.” In addition to an amount sufficient to pay for materials for the lots shown on the respective billings, plaintiff also retained from Horpel’s share of the joint checks varying amounts which were applied against Horpel’s running balance with plaintiff for materials, as well as against funds plaintiff had advanced to Horpel to help meet his payrolls. Mr. S chirm testified that “Whenever Mr. Horpel came in with a joint check ■—or let’s say at the start of a tract, we agreed upon an amount that we were going to take out of the joint cheek or the billings that would be at least equal to the amount of material on that tract, as far as by lot is concerned. Plus that, we were going to take an additional amount, whether it came out of his labor money or whatever. We were going to take more money than actually due on the material, but no less than what was the amount of the material on the lots. That is how a substantial portion of that [Horpel’s balance owing to plaintiff] got paid. . . . [Also] when the joint check was received from Pioneer . . . we . . . refunded to Mr. Horpel a certain portion of that for his labor, less the additional sum to cover the advance that we had given him prior to that. ’ ’ At the time plaintiff “took these payments back and applied them to” Horpel’s indebtedness to plaintiff, plaintiff had no lien for materials furnished for the particular lots (116-127) for which it filed the lien here involved, “Those materials would have been consumed in a lot at a [much] later date.” In approximately May 1957, Mr. Schirm, who had become concerned over the amount of money plaintiff had advanced to Horpel, discussed the problem with Mr. Sant (general contractor, and also representative of the owner), who, ‘ ‘ told me, Mr. Schirm, you keep the material rolling. I don’t want to bog down the tract, and I will keep the vouchers coming. ’ My fears were then quieted down that we might get stuck and not be able to get paid. ’ ’
Moreover, Rollingwood points to no evidence indicating that plaintiff had either the authority over Horpel or an obligation to Rollingwood to control disposition of the entire proceeds of the checks made out to plaintiff and Horpel jointly. Such checks, issued in payment of billings presented by Horpel, the subcontractor, belonged in part to him; the addition of plaintiff as a joint payee is not shown to have given plaintiff a right to withhold any greater sum from their proceeds (except as agreed to by Horpel) than was owing to plaintiff for materials furnished to the lots specified in the billings. Horpel’s endorsement of the joint checks was, of course, essential before plaintiff could secure any portion of the funds whatsoever. The fact that Horpel permitted plaintiff to retain a portion of Horpel’s share of the joint cheeks and apply them against Horpel’s indebtedness to plaintiff for money advanced and materials previously supplied to lots and pursuant to bills other than those for which the cheeks were issued (see fn. 3, ante) would upon no theory of law of which we are aware entitle Rollingwood to credit against its obligation to plaintiff for materials thereafter supplied to either the same or to further and different lots. (See Cooper v. Sparrow (1953) 222 Ark. 385 [ 259 S.W.2d 496 ]; Wells v. Planters Lumber Co. (1959) 230 Ark. 570 [ 327 S.W.2d 1 , 3-4 [4]].)
For the reasons stated the judgment is reversed.
Gibson, C. J., Traynor, J., McComb, J., Peters, J., White, J., and Dooling, J., concurred.
Cases cited
- Edwards v. Curry 152 Cal.App.2d 726 p. 792
- Westwood Building Materials Co. v. Valdez 158 Cal.App.2d 107 p. 792
- Petaluma Building Materials, Inc. v. Foremost Properties, Inc. 180 Cal.App.2d 83 at 86 p. 795
- Modesto Building & Loan Ass'n v. Wylde 217 Cal. 421 at 425 p. 795