Majority
Headnote
[1] Injunction—Finding—Negative Pregnant.—A finding in an action to restrain an irrigation district from permitting seepage •water from its canal to flow upon the land of the plaintiffs, that it is untrue that defendant ever since the use by it of the canal has negligently or carelessly or without right allowed water to flow upon the lands of the plaintiffs, is in the nature of a negative pregnant and implies the truth of the affirmative allegation which it attempts to deny.This action was brought to restrain the defendant from permitting seepage water from its canal to flow upon the lands of plaintiffs and for damages caused by such water. Judgment was rendered in favor of the defendant and the plaintiffs appeal. The plaintiffs allege: “That said ditch or canal was negligently and carelessly constructed by defendant, and that because of such construction by defendant water has constantly escaped and seeped through the bottom and banks of said canal, and said defendant, ever since the use by it of said canal or ditch for conducting water has negligently, carelessly and without right allowed said water to flow to and upon the said lands of plaintiffs.” These allegations are denied by the defendant. The defendant alleges, in substance, that it is an irrigation district organized under the laws of the state; that in accordance with the California Irrigation District Act it “caused to be prepared by a competent irrigation engineer a set of plans and specifications for the construction of said canal, which said plans and specifications were duly and regularly approved by the State Engineer of the State of California and by the Irrigation District Bond Commission”; that the construction of said works was authorized by a vote of the people of the district; that the canal was
The plaintiffs’ lands are adjacent to and northerly from the town of Anderson, and within the defendant district. Within said lands is an irregular shaped body of about twenty-five acres which, until partially drained, was a natural swamp into which the drainage from the neighboring territory lying to the west thereof collected. Until recent years nothing was produced in the swamp except wild hay, which was usually harvested from June to August of each year, depending upon the rainfall of the preceding winter and spring. Many years ago a ditch was constructed in an easterly direction which partially drained the swamp into the Sacramento River. In the year 1917 the defendant constructed the section of its canal to the west of plaintiffs’ lands in part along a steep hillside, and at an elevation of about fifty feet above the swamp. This section of the canal, the only one in question here, was well constructed and, in the language of the defendant’s engineer, “thrown so far back in the bank that the cut line on the downstream side came about the water line of the ditch.” The ground surface was plowed on the lower side “so that there would be a good bond between the old ground and the fill” and “stumps and large roots” were removed. The evidence shows that the consulting engineer was justified in saying, “I thought it was an excellent piece of construction.”
The appeal is taken on a bill of exceptions settled by the court and the appellants specify various particulars in which it is claimed that the evidence is insufficient to support the findings.
The court found that the portions of the lands which plaintiffs allege were overflowed by seepage water “had never been productive prior to the construction of defendant’s canal, and had never been used for the growing or production of crops, except wild hay, for the reason that the same were swampy and unproductive.” Witnesses for the plaintiffs testified that five or six acres of the swamp produced cultivated crops during the years 1913 to 1915,
[1] The court finds that “it is untrue that said defendant ever since the use by it of said canal or ditch for conducting water has negligently or carelessly or without right allowed said water or any water to flow to or upon the said lands or any lands of the plaintiffs.” This finding, attempting as it does to negative an affirmative allegation of the complaint, is in the nature of a negative pregnant and implies the truth of the allegation. (Southern Pac. R. R. Co. v. Dufour, 95 Cal. 619 , [19. L. R A. 92, 30 Pac. 783 ] ; Auerbach v. Mealy, 174 Cal. 65 , [ 161 Pac. 1157 ]; State ex rel. Bimell v. Box, 34 Tex. Civ. App. 435 , [ 78 S. W. 982 ].) The appellants, however, malte no objection to,the sufficiency of the finding, but specify only that it is unsupported by and contrary to the evidence. [2] The evidence that seepage water from the defendant’s canal flowed down to and upon the swamp is conclusive. The court found that in the “early spring” of the year 1918 the plaintiffs had “fully prepared the ground for planting and planted various valuable crops described in paragraph VIII of the plaintiffs’ complaint,” alleged in said paragraph to comprise twenty acres of the swamp. The court further found “that in addition to the crops so planted the plaintiffs fully plowed and [prepared?] for planting' three and one-half acres of said land.” It thus appears that after the end of the rainy season all but an acre and a half of the swamp was sufficiently dry to be plowed and planted. The evidence shows without conflict that within about two weeks after the defendant turned water into its canal in May, 1918, water began to flow into the swamp and continued throughout the irrigating season, covering the swamp and destroying the crops growing thereon. The evidence shows that the crops referred to in the findings were planted the latter
There was some contention that the flooding of the swamp was caused by a general rise of the water-table due to the irrigation of lands in the district, but the evidence shows that the lands, the irrigation of which might probably have that effect, were not in fact irrigated in the year 1918 until after the swamp was flooded. Witnesses for the plaintiffs testified that the water which caused the damage seeped from the defendant’s canal and flowed down in surface streams to the swamp. This testimony is corroborated by that of O. F. Oliphant, a ditch tender for the defendant, and one of its witnesses at the trial, who testified that he did not find any water seeping from the bank of the canal during the year 1918; “by ‘bank’ I mean the immediate levee or upthrow. ... I noticed seepage water below the bank of the ditch, from the McFarland place down to the high school. ... I noticed the water in 1917 the same as I noticed it in 1918.” Two gulches referred to in the testimony as gulches “F” and “E” merge and drain into the swamp. Mr. Oliphant testified on cross-examination: “I paid particular attention to those drains that ran out below the canal and merge in that gulch which is marked ‘F’ on the map; I noticed the branch of that gulch marked ‘E’; I noticed all of them; I noticed water coming from below the line of the canal and coming out and running down these drains; . . . there was water coming out of the hillside below the line of the canal in May and June, 1918; it came out near Diamond Creek here, out through that plug, out through the cut where the Anderson water-pipe went through, but I don’t know whether that was seepage from the canal or from the water company; I couldn't say whether the water company’s water came through a conduit of any kind, because it was under the ground; I never
Appellants concede, as under the evidence they must, that the defendant was not negligent in the original construction, but they contend that it was negligent in failing to correct a defect which developed in the actual operation of the canal. [3] To knowingly construct a canal through loose sand or gravel incapable of holding water, in a situation such as that disclosed here, without taking any steps to prevent or control seepage therefrom, would constitute negligence. (Tu rpen v. Turlock Irr. Dist., 141 Cal. 1 , [ 74 Pac. 295 ]; Shields v. Orr Extension Ditch Co., 23 Nev. 349 , [ 47 Pac. 195 ].) [4] If, in the actual operation of a canal, sudden and unexpected damage results by reason of some hidden defect which could not reasonably have been foreseen, the owner would not he liable in damages, because he is not an insurer but chargeable only in case of negligence. (Sutliff v. Sweetwater Water Co., 182 Cal. 34 , [ 186 Pac. 766 ].) After discovery of the defect, however, and after reasonable .opportunity to correct it, if the owner continue the use, his liability for subsequent damages would be the same as if he had known of the defect at the time of construction. The officers of the defendant knew that there was a heavy seepage from the Anderson section of the canal
[5] The defendant contends that the plaintiffs are guilty of contributory negligence in not maintaining their drain in condition to carry off the surplus water from the swamp. The trial court seems to have been impressed with this contention, for it found, “that it is possible by grading said drain and annually cleaning the same to carry off from the lands of plaintiffs all surplus waters collected in said swamp or marsh or pond by the drainage from the neighboring territory and seepage from defendant’s canal.” As herein before pointed out, the drain was sufficient to prevent the flooding of the swamp during the year 1918 from natural causes. The plaintiffs are not guilty of contributory negli
Respondent contends that, since its irrigating system was planned and constructed under legal sanction for a public purpose, any detriment suffered by the plaintiffs is “damnum absque injuria,” citing some of the reclamation cases wherein it was held that one owner has the right to levee against flood waters even though the effect be to throw such waters back upon his neighbor. Such decisions are based upon the theory that flood waters are a “common enemy” , against which each owner may protect himself even to the damage of other owners. It has further been held in numerous cases that a reclamation district is a governmental
The judgment appealed from is reversed.
Hart, J., and Burnett, J., concurred.
A petition to have the cause heard in the supreme court, after judgment in the district court of appeal, was denied by the supreme court on September 12, 1921, and the following opinion then rendered thereon:
[7] In so far as the opinion of the district court of appeal appears to indicate that the plaintiffs cannot recover damages for the injury to their land unless it appears that the flooding thereof which caused the injury was the proximate result of the negligence of the defendant in the construction afld maintenance of its canal, we disapprove the same. The canal is constructed for public purposes and to serve the purpose of distribution of water to public use. Apparently the damage to the plaintiffs is caused directly by seepage of water' carried in said canal through the intervening soil on to the adjoining land of the plaintiffs. In such cases the plaintiff is secured a right to damages by the constitutional provision that private property shall not be damaged for public use. (Art. I, sec. 14.) In such cases the care that may be taken in the construction of the public improvement which causes the damage is wholly immaterial to the right of the plaintiff to recover damage, if the improvement causes it. This was expressly decided in Reardon v. San Francisco, 66 Cal, 505 , [ 56 Am. Rep. 109 , 6 Pac. 317 ], and Eachus v. Los Angeles, 103 Cal. 614 , [ 42 Am. St. Rep. 149 , 37 Pac. 750 ], The proposition apparently was not considered by the district court and perhaps was not presented in the briefs or in the court below. Nevertheless, upon a new trial the question should remain open.
All the Justices concurred.
Cases cited
- Leonard v. Home Builders 174 Cal. 65 p. 562
- Turpen v. Turlock Irrigation District 141 Cal. 1 p. 564
- Sutliff v. Sweetwater Water Co. 182 Cal. 34 p. 564
- Eachus v. Los Angeles Consolidated Electric Railway Co. 103 Cal. 614 p. 568