Majority
The board of trustees of the City of Elsinore, a city of the sixth class, on March 12, 1925, passed resolution of intention No. 117 declaring its intention to construct a water supply and distributing system for fire protection and domestic water supply, it being declared therein that the proceedings were being taken pursuant to the “Improvement Act of 1911” [Stats. 1911, p. 730] and the “Improvement Bond Act of 1915” [Stats. 1915, p. 1441]. Steps were subsequently taken resulting in the acceptance of the bid of the defendant Claude Fisher for the performance of the work, and a resolution was adopted by the board awarding the contract therefor to defendant Fisher. Within ten days from the first publication of the notice of award of the contract to defendant Fisher, the plaintiffs, J. E. Mills and Mabel A. Mills, with others, all owners of land liable to assessment, filed with the clerk of the board a written notice and protest, claiming that the previous acts and proceedings relating to the improvement were irregular, defective, erroneous, and faulty, which notice stated that it was given and the protest made pursuant to the provisions of section 16 of the Improvement Act of 1911, and specified that the acts and proceedings were irregular, defective, and erroneous, and faulty, in a number of respects, the following being set forth in appellants’ brief, to which our attention is directed: “(1) That the Resolution of Intention does not correctly describe the location of the work and improvement; (2) That the char
Curt Miller, superintendent of streets, entered into the contract with defendant Fisher, who entered upon the execution of the work. Plaintiffs thereupon brought this action against the City of Elsinore, the five persons constituting its board of trustees, the clerk, treasurer, and street superintendent and the contractor, Claud Fisher, praying for an injunction pendente lite, as well as a permanent injunction, restraining the performance of the work and improvement, the making of any assessments or the issuing of any bonds to cover the cost thereof, and restraining the imposing or creating of any cloud, lien or assessment upon the land of the plaintiffs, and praying for a decree adjudging that the contract is invalid and that the proceedings leading up to the execution of the contract were irregular, defective, erroneous, and faulty. The application for an injunction pendente lite was denied, and upon the trial on the merits judgment was rendered for defendants, and from this judgment plaintiffs have appealed.
It is contended that the judgment should be reversed for the following reasons: (a) That the board of trustees has no power under the act to construct buildings, or purchase or install motors and electrical apparatus; (b) that because of defects in the resolution of intention the board never ac
We shall discuss the points in the rotation in which they are urged. As to assignment (a) that the hoard of trustees has no power under the act to construct buildings or install motors and electrical apparatus, it may be said that authority to do such is contained in section 2 of the Improvement Act of 1911, as amended, which provides for the ordering upon any street, public property, or right of way of a city “wells, pumps, dams, reservoirs, storage tanks, tunnels, conduits, pipes, hydrants, meters or other appurtenances for the supplying or distributing a domestic water supply.” In addition to the general power, subdivision J of section 2 provides for general incidental powers with reference to the improvement of streets, public property, etc., and subdivision K of section 2 provides for all other work auxiliary to any of the above which may be required to carry out the samo. Appellants contend that because the resolution of intention provided for certain buildings, and electric motors to operate the pumps, that the power granted by the legislature has been exceeded, and in support of their contention cite Thompson v. Hance, 174 Cal. 572 [ 163 Pac. 1021 ], Federal Construction Co. v. Ensign, 59 Cal. App. 200 [ 210 Pac. 536 ], and Spring Street Co. v. Los Angeles, 170 Cal. 24 [L. R. A. 1918E, 197, 148 Pac. 217 ], In the Thompson ease it is held that work of an entirely different and independent character from that specified in the act could not be justified by virtue of a blanket provision in the Vrooman Act corresponding to subdivision J of section 2 of the Improvement Act of 1911, and the Federal Construction Company and Spring Street cases hold that under our system of government no assessment can be made upon any land on any principle other than that of special benefits actually or presumptively received.
The manifest intention of the Improvement Act and of the language used with relation to appurtenances and auxiliary work make it apparent that the legislature not only intended to provide for the installing of wells and pumps,
Under specification (b) that because of defects in the resolution of intention the board never acquired jurisdiction to order the improvement, appellants claim that the resolution of intention does not briefly describe the work in that it does not define and locate the right of way for the discharge pipe from the pumping station. The language used in the resolution in this respect is: “and such water well and pumping plant construction work shall include the construction of a wrought steel discharge pipe from said pumping station and on a straight line, across an alley, over certain property belonging to said city and along a right of way therefor, across LangstafE street to a point adjacent to the east line of lot 23, block 87, of said tract.” The language immediately preceding had dealt with and defined the location of the pumping plant, namely, upon lot 13, block 80, Heald’s Subdivision of Elsinore, and the entire resolution of intention is tied up to the plans and specifications. The location of the pumping plant having been specified and the resolution of intention stating that this pipe-line runs in a straight line from this pumping plant across the alley and across LangstafE Street to a point adjacent to the east line of lot 87, furnishes a brief description of the work, and the plans referred to indicating exactly where the pipe-line is to be laid, sufficiently complies with
Referring to appellants’ further objection under this heading that the extent of the right of way, its termini, width, etc., is not sufficiently located, it may be said that plan No. 117 (Defendants’ Exhibit No. Ub-D) shows the notation with respect to this line as follows: “Trench one foot west of west line of lot 12 of block 5.” The clause “over a certain right of way belonging to the city adjacent to the westerly lines” of certain lots 'taken in connection with this plan sufficiently locates the right of way, as it adjoins the west line of certain given numbered lots, at the most farthest in one direction and ends at the end of the lot most farthest in the other direction, which sufficiently fixes the termini of the right of way. The same objection is made with relation to the reservoir. The resolution of intention states upon what particular lots of a given tract of land the reservoir is to be located and refers to the plans for further particulars. The plans show that the reservoir is located upon a parcel of land, one corner of which is the north corner of lot 25, block 14, Country Club Heights Unit No. 3; another
Appellants urge under assignment (c) : “That variances and ambiguities invalidate the proceedings and the contract,” that where, as here, the description of the work is partly in the plans, and partly in the specifications, a variance or conflict in the description with respect to the extent of the improvements, materials to be used, etc., constitutes a fatal defect and invalidates the proceedings. That the resolution of intention provides for the improvement of Poe Street where no pipe-line is to be laid, and therefore, that this constitutes a conflict; but an inspection of plan No. 115 (Defendants’ Exhibit 14-B) shows that at this particular block Poe Street is “vacated” and is so marked and, therefore, it is not Poe Street at all. The same applies to the objection as to two pipe-lines on Graham Avenue where the discrepancy exists as to whether there is to be one or two pipe-lines.
The next objection which the appellants present relates to the fittings indicated in part by plan No. 117 (Defendants’ Exhibit 14-D), particularly referring to intersections designated as intersections 1 and 6, and they urge that by reference to plan No. 114 (Defendants’ Exhibit 14-A), which is connected up with plan No. 117, it appears that inter
Again, appellants complain that there is a discrepancy between plan 116 (Defendants’ Exhibit 14-C) and plan 123 (Defendants’ Exhibit 14r-J) in that the latter shows an eight-inch pipe-line, both north and south of the intersection with Flint Street, while the former shows the eight-inch pipe-line on Main Street to extend from a point fifteen feet from the north line of Flint Street, in a southerly line to the north line of Mountain View Avenue and a six-inch pipe-line to extend from the last-named point in the intersection of Flint Street northerly to Minthorn 'Street. Plans 115 and 116 (Defendants’ Exhibits 14-B and 14-C) are major plans as distinguished from special detail plans of appurtenances and accessories. Plan 123 (Defendants’ Exhibit 14-J) is one of the detail plans. We do not understand that there is any conflict here. The intersection on the last plan shown as F-One may well be reasonably construed to indicate only the eight-inch pipe in the immediate
Again, complaint is made that plan No. 118 provides for the construction of certain fittings at intersections Nos. 30 and 35, but that plan No. 116 recites that intersections Nos. 30 and 35 are not part of the drawings. This is the same
The next point made is that plan No. 120 (Defendants’ Exhibit 14-C) with respect to one of the vertical motors provides that it shall have 20 horse-power and that the specifications provide that the motors “shall be of ample H. P. to satisfactorily carry the maximum load under which they will be required to operate without over-heating.” If there were no further explanations appearing in the proceedings, such a point would not be of any particular merit unless in conjunction therewith it is shown that 20 horsepower was either not ample to carry the load or was in excess of that needed. It must be remembered that this
There is no merit in the objection that plan No. 120 provides that the pump at station No. 2 is of a 450-gallon per minute capacity, while the specifications relating to the capacity of the pump say that it shall be “between 440 and 460 gallons per M. operating against a head of 125 feet.” The notation appearing upon the plan is necessarily the “rated” capacity of the pump. In actual working conditions pumps of a given definite capacity will perform differently according to whether they lift in hot or cold water, or operating at different elevations above sea level. The proper explanation of the plans and specifications is that they are to supply a pump of theoretical rated capacity of “450 G P M” (which is a technical pumping engineering term), capable, at the conditions existing in the City of Elsinore, of delivering between 440 and 460 gallons per minute, operating against a head of 125 feet. In actual practice, even a layman knows that a pump of rated capacity frequently varies somewhat in its actual performance under varying conditions.
The next objection made is that plan No. 120 provides for “overload relay,” and that the resolution of intention provides, in general terms, for “overload relays” without definitely specifying that there are more or less than one.
It is a rule of construction that the plural may mean a
Again, appellants complain that the specifications with relation to the pump at station No. 3 provide that it shall be of the underground discharge type. That merely means that it is so constructed that with its appurtenances and connections water can be conveyed directly from the immediate vicinity of the pump to the underground line. The pump could still be of the underground discharge type. If we take plan No. 121 (Defendants’ Exhibit 14-H), of which they complain, and compare it with plan No. 117 (Exhibit 14-D), we will see that fifteen feet from the center of the well and immediately to the south of it is located the concrete receiving tank; again, if we refer to plan No. 119 (Defendants’ Exhibit 14-F), we will perceive that the discharge pipe from the pump to this receiving tank, which is fifteen feet distant therefrom, enters the receiving tank at a point one foot and ten inches below the ground line. For practical purposes, therefore, it sufficiently appears that the discharge would be elbowed down to meet the underground pipe coming from the receiving tank and this would be sufficient compliance to cover the use of the term “underground discharge.” Moreover, appellants have not shown that there is any radical difference of construction or of cost between this type of discharge pipe and some other method or that it would tend in anywise to increase or lower the cost or to have any effect whatever on the efficiency of the pumping plant.
Again, appellants complain that the resolution of intention provides that the pipe to be laid “shall be wrought steel screw pipe” and that the specifications provide that “all pipe is to be wrought steel welded pipe.” This in itself is not a conflict. “A screw pipe” means that on the ends of each pipe threads are placed to permit it to be screwed to the next connecting pipe to be laid. A “welded pipe” does not have the significance that it is to be welded to the next connecting pipe, but merely means that in the manufacture of the pipe the longitudinal break, which is formed in the center of the pipe in the rolling of the steel plate which forms the pipe, is welded instead of being joined in some other manner.
The next objection made is the claim that the proceedings are invalid because on plan No. 117 there is a notation of two pieces of pipe totaling 32 feet in length, extending from the pumping station to the concrete receiving tank, that bears the mark “W I” pipe and that the resolution of intention and specifications call for “wrought steel” pipe. There is no explanation of what the lettering “W I” means in any of the proceedings, but there are abundant notations on this plan and specific requirements in the specifications and the resolution of intention to the effect that the pipe to be laid shall be “wrought steel” pipe.
The next objection is to the manner of describing the pumps, motors, and appurtenances. Objections are separately taken up as to each pump, but inasmuch as the objections made are for the most part merely repetitions of objections made to each pump, we will consider the objection only as to one of the three different pumps.
The description of the pumps and appurtenances at station No. 1 is set forth in the resolution of intention in subdivision D. The specifications provide further with reference to the pumps to be installed at that station, as is shown under the heading “Pumps” station No. 1. In general the pump is to be the Kimball type, auger pump or equivalent. Its capacity is to be between 260 and 280 gallons per minute operating against a head of 125 feet. The word “equivalent” in mechanical matters has a distinctive meaning in the trade, which is a combination of the ordinary use of the word and the meaning of the word as used in the patent law and indicates a device of practical equivalence in value and effect and of substantially the same design performing the same functions in practically the same manner.
Water pumps of this character are now practically standard. It is necessary only to tie up the resolution of intention and plans to make a size and tjqpe of pump, and make the plans sufficient to indicate a particular design or number and give a general outline such as will indicate the kind, size, and character of the pump wanted. If the plans, specifications and resolution of intention are sufficient with respect to this particular pump to indicate the adoption of a certain Kimball type, auger pump, as manufactured by the Frank J. Kimball Company or equivalent, it is not then necessary to show cross-sections and specifications of foundry make, manufacturers’ details and patterns because a particular thing has been identified and is a standard article that can be supplied in the general market.
In order that these plans should receive the interpretation of the court as such interpretation would be given by a con
This brings us to appellants’ objection “that unlawful discretion and power is delegated to the superintendent of streets and the city engineer, ’ ’ and they urge that the law requiring certainty and definiteness in special assessment proceedings prohibits the delegation of any discretionary power by which the materials or extent or cost of improvement may be varied, and that the rule which requires that specifications must definitely and with certainty describe the extent of the work to be done, is subject only to an exception in cases where the details of the construction do not permit it, citing authorities in support of such contention. We are in accord with the law as stated, disagreeing with appellants only with relation to its application to the situation presented here.
Appellants have set forth in their brief a number of paragraphs from the specifications. Among those having to do with the delegation of discretionary power to the officers named is the following: ‘ ‘ The nature of the work will necessitate leaving open considerable length of trenches, and the contractor shall have facilities for rapid back-filling, when so instructed by the engineer.—If so directed by the superintendent of streets, the filling shall be settled with water at not more than two intermediate depths, to be determined by the street superintendent before it is brought to one foot from the surface—No excavating material shall be removed from the street until back-filling is completed, but as soon as the trenches are refilled, in a manner satisfactory to the engineer.” The remaining paragraphs reproduced by appellants in their brief have been sufficiently discussed. These objections, while being merely trivial, appear also to concern things which could not with reasonable diligence and cost be ascertained in advance and which would be
This brings us to appellants’ final objection that no special or compensating benefit can arise from the construction of a municipal water system where only a portion of the city is assessed therefor.
The test of the right to create a public improvement by special assessment does not resolve itself upon the point as to whether there exists some general public benefit because every assessment proceeding contains an element of public benefit. The test is, does there exist with relation to the work a special and peculiar benefit to the property to be assessed. In the present case while not all the city is involved in the assessment district, there is no evidence showing that any part of the city could be benefited by the construction of any of the work save that part which is included within the district. It would, therefore, be unreasonable to require the payment to be made from general funds or by a bond issue over the whole city which is not benefited by the improvement. Furthermore, as is said in Kane v. Wedell, 54 Cal. App. 516 , 521 [ 202 Pac. 340 ], “The statute undoubtedly was intended to authorize the city council to make whatever special improvement might be deemed necessary for the welfare of the city, or any part thereof ... a power to include the whole city in one district if necessary for an improvement which affected the whole, or to divide the city into smaller districts for other special improvements which might affect only the particular sections so included.”
As the variances and discrepancies complained of are on the whole slight, and as it does not appear that the cost of the work, because of such variances or the discretion vested in the engineer, materially increased or decreased the cost of the work, they do not vitiate the proceedings (Mill Valley v. Bonding Co., 68 Cal. App. 372 [ 229 Pac. 891 ]).
The purpose of the resolution of intention and the plans and specifications is for the benefit of the property owners and contractors who are to bid on the work. If they are sufficiently certain and definite, upon all the details of
We think the proceedings sufficiently comply with the statute, and that the record contains no error calling for a reversal.
The judgment is affirmed.
Tyler, P. J., and Knight, J., concurred.
A petition by appellant to have the cause heard in the supreme court, after judgment in the district court of appeal, was denied by the supreme court on November 1, 1928.
All the Justices present concurred.
Cases cited
- Thompson v. Hance 174 Cal. 572 p. 757
- Federal Construction Co. v. Ensign 59 Cal. App. 200 p. 757
- Spring Street Co. v. City of Los Angeles 170 Cal. 24 p. 757
- Richmond Constuction Co. v. Growney 29 Cal. App. 427 p. 759
- City St. Improvement Co. v. Kroh 158 Cal. 308 p. 769
- Kane v. Wedell 54 Cal. App. 516 at 521 p. 769
- Town of Mill Valley v. Massachusetts Bonding & Insurance 68 Cal. App. 372 p. 769