Majority
Headnote
I. If there was evidence to support each finding- made by the Official Referee, the court will not disturb his decision on appeal. (Aldridge v. Aldridge, 120 N. Y. 614 ; Carpenter v. Mosher, 125 N. 736; Baird v. Mayor, etc., of City of N. ¥., 96 N. Y. 567 ; Aerated Products Go. v. Godfrey, 290 N. Y. 92 ; People ex rel. MacCracken v. Miller, 291 N. Y. 55 .) II. The declared policy and intent of the State of New York has always fully recognized that in the construction and operation of the Barge Canal injuries to waterpower and riparian owners would result, and that the State would prevent such injuries as far as possible, and that the State would compensate the property owners for such injuries so occasioned, whether or not such damages were occasioned by the acts of theThe National Cellulose Corporation acquired between 1925 and 1929, inclusive, by various conveyances, in fee simple, and has since been the owner in possession of, a valuable water power and factory site on the southerly side of the Seneca River in Baldwinsville, near what is known as the Baldwinsville Dam,” “ together with water power and privileges thereunto belonging ” and riparian rights appurtenant thereto, and was engaged in the manufacture of paper products in a irn'll and other buildings located on said property with necessary machinery and equipment and a productive capacity of 13,000 pounds of paper per day. It has been found by the courts below that it owned a one-fifth right among other property owners to take water for its purposes from the pool in the river above the Baldwinsville Dam amounting to four hundred and fifty cubic feet per second under an eight-foot head subject only to the superior right of the State to take for navigation purposes during navigation seasons twenty cubic feet per second and four other property owners to take six hundred thirty-one cubic feet per second from the impounded waters. The property had been used by claimant’s predecessors in title for the same purpose and under similar conditions as to the use of water power for more than fifty years before the State began the construction of the Barge Canal.
This claim was filed on March 21, 1932, within the time specified by the Legislature under enabling acts (L. 1921, ch. 630 and L. 1931, ch. 693) upon the authority of chapter 147 of the Laws of 1903 (commonly known as the Barge Canal Act), to recover damages for interference with and appropriation of the property rights of claimant by the State and embraced all damages sustained from the date of its acquisition of title to the date of filing the claim. The claim was referred for hearing and determination to Honorable Feank H. Hiscock, an Official Referee of this court. During the hearing, upon application of the State, the claim was limited and amended to include only damages suffered by claimant through injury to its property and riparian rights during the years 1930 and 1931. There has been
By chapter 54 of the Laws of 1809, the State authorized the construction by Jonas C. Baldwin, his heirs and assigns, of what is known as the Baldwinsville Dam, in the Seneca River, a navigable stream, at Baldwinsville, N. Y., of such a height as might be necessary for improving the navigation of the river but “ not exceeding seven and an half feet on the rapids above said dam,” with the fight “ to take and make use of the water in said dam for the use of mills and hydraulic works, or to any other use to which the same is capable of being applied upon land owned by him, his heirs or assigns ”, for a period of twenty years, which term was extended by later statutes. Baldwin was then the owner of riparian rights appurtenant to the lands he owned adjoining the river. Conditional upon the grant was a construction by Baldwin of an apron of an even ascent from the bottom of the river to the top of the lowest part of the dam, not exceeding a twelve and a half degree elevation, to
The grant to Baldwin of water rights and privileges of the use of the waters of Seneca River was continued undisturbed .and all conditions of the grant were performed by Baldwin •and his heirs and assigns until 1850 when, by chapter 153 of the laws of that year, the State' acquired the dam, locks and canal theretofore constructed by Baldwin in the exercise of the power of eminent domain, took possession of the dam and .acquired so much'of the waters of the river as should be necessary for the purpose of improving the navigation of the river and the operation of the locks and canal to be maintained at the same place and no more (§8). The Canal Commissioners were directed to maintain the dam at Baldwinsville for the purpose of improving the navigation of the Seneca River and to appropriate only so much of the water of the river as was necessary to operate the canal and to permit the surplus water, if any, to be drawn from said dam and canal for hydraulic purposes. The provisions of the 1809 Act relating to the grant of property rights to Baldwin and his heirs and assigns were continued in full force and effect until the State should acquire title to all the rights of Harvey Baldwin and the representatives of Stephen W. Baldwin, who had succeeded to the title of Jonas Baldwin, their father, in 1819, in and to said dam, locks and canal (§ 11). The river was thereupon further canalized by the State, the dam was rebuilt at an elevation of
Under chapter 147 of the Laws of 1903, it was provided that the Barge Canal should, in part, be located in the Seneca River and involved reconstruction of the Baldwinsville Dam and construction of locks and other accessories in that location for the convenience of navigation. The State engineer was authorized to enter upon, take possession of and use lands, structures and waters, the appropriation of which for the use of the improved canals and for the purposes of the work and improvement authorized by that Act should in his judgment be necessary, and the Court of Claims was given “ jurisdiction to determine the amount of compensation for lands, structures and waters so appropriated.” ' Thus the State waived any claim that it might appropriate or interfere with the use of the waters of Seneca River for the necessity of navigation as against the contractual rights of Baldwin and his heirs and grantees without due compensation to the owners thereof (Oswego & Syracuse R. R. Co. v. State, 226 N. Y. 351 ). It was found by the Referee, upon documentary and other evidence, which finding was approved by the Appellate Division, that one of the purposes of the State in connection with the construction of the Barge Canal was to preserve the rights of power users so far as was consistent with the public interest.
In the course of the building of the Barge Canal under the Act of 1903 and supplementary and amendatory acts, the State,among other things, rebuilt the Baldwinsville Dam and raised its crest from 372.28 to 374 feet Barge Canal datum, constructed a new canal parallel with the river to the south of the property later acquired by claimant and therein constructed a lock which, with uncompensated leakages and necessary use of water for its operation took from the pool above the dam far in excess of twenty cubic feet per second during every day of the navigable seasons, made numerous changes in the control of the normal flow of water from the watershed above the pool and interfered with normal flow of water from feeders of the river and compelled power users to shut down their plants when the water
The State argues that, in any event, damages may not be awarded which accrued after April 23, 1931, the effective date of - the enabling Act of 1931. That position cannot be sustained in view of the fact that the claim in question was specifically filed not only under the enabling Act of 1931 but also under the enabling Act of 1921 which provided for the filing of claims for past or future damages within one year after such damages accrued, or, where such time had lapsed, within one year from the passage of the Act. The Act of 1931 is not, in effect, an amendment of the Act of 1921. It provides that, notwithstanding the lapse of time since the accruing of damages, a claim for damages theretofore suffered or caused as mentioned in the Act
¥e have not overlooked other points raised by the State bnt we find no point of law which requires further consideration.
The judgment of the Appellate Division should be reversed and judgment of the Court of Claims entered on the decision of the Official Referee affirmed, with costs to the National Cellulose Corporation in this court and in the Appellate Division.
Lehman, Ch. J., Loughran, Lewis, Conway, Desmond and Thachee, JJ., concur.
Judgment accordingly.
Cases cited
- Aldridge v. Aldridge 120 N. Y. 614 p. 439
- Baird v. Mayor 96 N. Y. 567 p. 439
- Aerated Products Co. of Buffalo, Inc. v. Godfrey 290 N. Y. 92 p. 439
- People ex rel. MacCracken v. Miller 291 N. Y. 55 p. 439
- Oswego & Syracuse Railroad v. State 226 N. Y. 351 p. 440, p. 445
- Silsby Manufacturing Co. v. State of New York 104 N. Y. 562 p. 440
- Heiman v. Bishop 272 N. Y. 83 p. 440, p. 447
- Colrick v. Swinburne 105 N. Y. 503 p. 440
- Reisert v. City of New York 174 N. Y. 196 p. 440
- Robinson v. Thompson 204 N. Y. 660 p. 440
- New York Rubber Co. v. Rothery 132 N. Y. 293 p. 440
- Gallagher v. Kingston Water Co. 25 App. Div. 82 p. 440
- Neal v. City of Rochester 156 N. Y. 213 p. 440
- Raschid v. News Syndicate Co. 265 N. Y. 1 p. 440
- Foster v. Central National Bank 183 N. Y. 379 p. 440
- Harriss v. Tams 258 N. Y. 229 p. 440
- Drucker v. Manhattan Railway Co. 213 N. Y. 543 p. 441
- Shepard v. Manhattan Railway Co. 169 N. Y. 160 p. 441
- Bonnell v. Griswold 89 N. Y. 122 p. 441
- Wahl v. Barnum 116 N. Y. 87 p. 441
- Kelly v. Leggett 122 N. Y. 633 p. 441
- Israel v. Manhattan Railway Co. 158 N. Y. 624 p. 441
- Gordon v. Ellenville & Kingston Railroad 195 N. Y. 137 p. 441
- Sage v. Mayor of New York 154 N. Y. 61 p. 441
- Little Falls Fibre Co. v. Henry Ford & Son, Inc. 249 N. Y. 495 p. 441
- In re the City of New York 256 N. Y. 382 p. 441
- People v. New York & Staten Island Ferry Co. 68 N. Y. 71 p. 441
- Stone v. State 138 N. Y. 124 p. 441
- Farrington v. State 248 N. Y. 112 p. 441
- Smith v. State 227 N. Y. 405 p. 441
- Coleman v. Manhattan Beach Improvement Co. 94 N. Y. 229 p. 441
- Jones v. Smith 73 N. Y. 205 p. 441
- Thayer v. Finton 108 N. Y. 394 p. 441
- Buckles v. State 221 N. Y. 418 p. 441
- Clark v. Post 113 N. Y. 17 p. 441
- Konner v. State 227 N. Y. 478 p. 442
- James Frazee Milling Co. v. State 122 Misc. 545 p. 443
- In re Board of Water Supply 277 N. Y. 452 p. 447