Majority
Headnote
Explosion o. Ely Wheel—Engineer—Mistake ob' Judgment.On November 12, 1895, a fly wheel, 20 feet in diameter, weighing 50,000 pounds, forming part of one of the steam engines operated by the defendant in its power house upon the east side of South Pearl street, in the city of Albany, burst, and some of the fragments, flying through the west side of the power house across the street and into a saloon upon the west side of the street, struck and killed John Piehl, the plaintiff’s intestate. The plaintiff brought this action under the statute to recover damages, charging that Piehl’s death was caused by the negligence of the defendant. Upon the trial the plaintiff sought to prove defects in the defendant’s machinery and appliances; also the inadequacy of its force of operatives ; but upon the close of the testimony the learned trial court held that the evidence was not sufficient to raise any question in these respects, and that the only evidence raising any question of negligence upon the part of the defendant was in respect to the action and competency of the engineer in charge of the power house at the time of the explosion and immediately preceding it. We are not called
The main question for us to consider is whether the evidence touching the action of the engineer under the circumstances disclosed, or his competency, presented a case justifying the submission to the jury of the question whether the explosion of the fly wheel was caused by the negligence of the defendant. The defendant operated several lines of street cars by means of electricity generated in this power house and distributed from it. There were five steam engines in the engine room of the power house, three of which were in operation at the time of the explosion. Two' of the three were the Cooper, Corliss & Co. engines, each of 500 normal horse power, and are designated in the record as Nos. 1 and 2, and were exactly alike. The fly wheel of No. 1 burst. The third engine was of 250 horse power. These engines consisted of a cylinder for the piston, a crank turned by the piston, a shaft to which the crank was attached which drove the fly wheel. A belt from the fly wheel of No. 1 to the pulley of a generator of electricity of 500 horse power, standing near, drove the latter with great rapidity, and thus generated the electricity, which was taken from the generator to the commutator, and from thence passed upon trolley wires over the railroad tracks. The steam was fed to the cylinder from the boilers in an adjoining boiler room from an overhead pipe. At 3 o’clock in the afternoon upon which the explosion occurred, John Herlihy, one of the three assistant engineers employed by the defendant, took charge of the power house, succeeding William Parr, who had been in charge the eight previous hours. Herlihy made an examination, and found everything in apparent good order, and working smoothly. At 3:40 o’clock he was engaged in trimming an electric lamp which was suspended from above, and was raised and lowered by a cord. This lamp was between engines 1 and 2, and was about 12 feet from the easterly side of the room. While thus engaged, his attention was arrested by the violent sparking at the generator of engine No. 1. He instantly went to the generator, about 40 feet distant, to ascertain the cause. He did not discover it. He then went to the switch board, about 12 feet further on, in a diagonal direction, and looked at the ammeters of engines Nos. 1 and 2,—that is, the measurers of the current or amount of load that each generator produces, which were attached to the switch board,—and noticed a great disnarity in what the case terms the “amperage,” or load of electricity, which each generator was making, and which each engine was carrying. The ammeters indicated between 700 and 800 amperes upon engine No. 1, and between 200 and 300 amperes upon No. 2. When he went upon duty, he had noticed
The question of fact next presented to the jury was: If the engineer saw the engine was running away before he pulled the circuit breaker, was this a mistake, and did it cause the explosion? Expert witnesses upon the side of the plaintiff testified that it was a mistake. Expert witnesses upon the part of the defendant testified that it was not.. We have already indicated the reason given by the expert witnesses for the plaintiff, namely, that lightening the load the engine was carrying would remove the obstacle to its speed. The reasons given by the expert witnesses for the defense were that the violent sparking at the generator indicated that something was wrong with it; that the inspection of the ammeters was the next
Without discussing other questions urged by the appellant, we think, for the reasons above stated, the case was improperly submitted to the jury.
Judgment and order reversed; new trial granted; costs to abide the event. All concur.
Cases cited
- Wangler v. Swift 90 N. Y. 38 p. 258
- Cosulich v. Standard Oil Co. 122 N. Y. 118 p. 258
- Reiss v. New York Steam Co. 128 N. Y. 103 p. 258
- Burke v. Witherbee 98 N. Y. 562 at 568 p. 260
- Wynn v. Central Park, North & East River Railroad 133 N. Y. 575 p. 261
- Bagley v. Bowe 105 N. Y. 171 p. 261
- Baulec v. New York & Harlem Railroad 59 N. Y. 356 p. 261
- Hayes v. Forty-second Street & Grand Street Ferry Railroad 97 N. Y. 259 p. 261
- Linkauf v. Lombard 137 N. Y. 417 p. 261